Used:: | Hotel Apartment | Material:: | According To Customer’s Request |
---|---|---|---|
Regional Style:: | Modern Style | Size:: | Customer-made Size |
Lead Time:: | 30-45 days | Design:: | As Client Requirement Or Drawing |
High Light: |
apartment bedroom furniture, contemporary apartment furniture |
Modern White Color Hotel Apartment Bedroom Furniture Set With Living Room
A046-Hotel Apartment Description
NO. | Name | Dimention (mm) | REMARK | ||
W | D | H | |||
1 | Headboard | 1800 | 30 | 900 | 1. MDF / plywood covered with fabric; |
2 | Bed Base | 1800 | 2000 | 300 | 1. Solid wood frame; 2. MDF / plywood covered with fabric; |
3 | Bedside Table | 500 | 450 | 550 | 1. MDF / plywood covered with wood veneer; 2. 2 drawers with handles; |
4 | Writing Table | 1200 | 550 | 750 | 1. Stainless steel legs; 2. MDF / plywood covered with wood veneer; |
5 | Coffee Table | 450 | 450 | 550 | 1. Stainless steel legs; 2. Marble Table top; |
6 | Sofa | Standard | 1. Solid wood frame; 2. High density foam and fabric; |
||
7 | Two Seat Dining Table | 900 | 900 | 750 | 1. Solid wood legs; 2. Marble table top; |
8 | Dining Chair | Standard | 1. Solid wood legs; 2. MDF / Plywood coverd with foam and fabric; |
Description Of Material
1.SGS E1 MDF board.
2.Thickness 0.6mm quality nature or engineerd veneer.
3.Environmental friendly lacquer.
4.High quality China-made fabric or import fabric which offered by customer.
5.Different density for foam to select.
6.German Hafele or Chinese brand DTC hardware.
7.If require, fabric and foam can meet American fireproof standard, such as CA117.
8.If require, fabric and foam can meet Britisn fireproof standard, such as BS5852.
How to place an order?
A: You can contact us and visit our showroom to select your favorite product ,or send your purchase order to
our email and tell us your requirement,we need some information to make a quotation as follow:
1) Product basic information: Quantity,size,picture or drawing of product.
2) Material requirement: What kind of veneer,solid wood,fabric or leather,plywood or MDF do you want?
3) Any other specified material :like Hefele slides,Formica laminate and so on.
4) Shipping information: Company name,Address,Phone number,Destination seaport.
5) Forwarder’s contact details if there is any in China.
Production Schedule
1. After we get the 30% deposit, 5 days for shop drawing.
2. 5-7 days for confirming the shop drawings.
3. 45 days for production.(After confirmed the shop drawings and fabric)
4. 4. 35 days for shipping (Include the customes clearence time.)
5. Customer-made fabric need 40days,which is included in the total quantity.
6. TOTAL: About 90 days the goods will be arrived.
(Note: The above time is Working time.)
About Shangdian Hotel Furniture Factory
Shangdian Hotel Furniture factory was established in 1996, and has been specializing in hotel furniture
and manufacture of restaurant furniture.
- More than 350 professional workers,which can be sent to different countries all over the world to
- fix the furniture. Them has experience of furniture of over 10 years.
- Over 50,000 square meters workshop and 2,000 square meters showroom.
- More than 20 years experience in hotel furniture market.
- Quality standard: ISO 9001,SGS,CE
We company major in customized furniture, our products:
Hotel bedroom sets, fixing furniture,chairs & tables for restaurant,lobby furniture.
Our Workshop:
More Apartment Product Photo: